外文翻譯-如何搞好建設項目的工程造價控制
《外文翻譯-如何搞好建設項目的工程造價控制》由會員分享,可在線閱讀,更多相關(guān)《外文翻譯-如何搞好建設項目的工程造價控制(5頁珍藏版)》請在裝配圖網(wǎng)上搜索。
附錄 1 to A of of of of of to in of of 0% in of of of is % It is to is of to of is in is a in to a is to to of be to So do a in to a is in of in of at to of of to in a to of to to of to of to "in to be of (a) of to of of of by to of is to of to in of of of of a 0 of is to of a on of of to or of of of is an in of it is of an in be in of of s of be to a of be of of of a of to be to of is of it in of a of in a of as as do to is of of is an (B) of to a to of is of in is to of of of if to to to a to to of in of of of of a of %, of to 5%. It is to do a of is of be to of in of be to of of of of to of of a of a of to in in is in of to of in of of at of of of to of to of be a be in of of do in To of of of be as of of is to of to of at of to of in of of as as to of of to in (C) of is of of of of a of in so . To of to it is to of to in to of of to of of of of of of of at is is to in to in of in a of to in a be to of be as as To of be as as in in of to to so of a of in of of in at to of of go to of in an of on on to in a to to of of to a at of in of of is of to of of in of of of a of of in to 《 ; 《 ; 附錄 2 如何搞好 建設項目的工程造價控制 一、建設項目工程造價控制的重要意義 建設項目的造價控制貫穿于項目的全過程,即項目決策階段、項目設計階段、項目實施階段和竣工階段都關(guān)系到建設項目的造價控制。統(tǒng)計資料顯示,在項目決策階段及設計階段,影響建設項目造價的可能性為 30%而在實施階段影響建設項目造價的可能性僅為 5%顯而易見,控制工程造價的關(guān)鍵就在于項目實施之前的項目決策和設計階段,項目決策是決定因素,而設計則是關(guān)鍵因素??刂乒こ淘靸r不僅僅是防止投資突破限額,更積極的意義是要促進建設、工、設計單位加強管理, 使人力、物力、財力有限的資源得到充分的利用,取得最佳的經(jīng)濟效益和社會效益。因此做好工程造價的控制工作,對保證和加速思經(jīng)濟發(fā)展具有一定意義。 二、控制建設項目工程造價的措施 建設工程造價的有效控制就是在投資決策階段、設計階段、工程發(fā)包階段、合同實施階段把建設工程造價的發(fā)生額控制在批準的工程造價限額以內(nèi),隨時糾正發(fā)生的偏差,保證項目投資目標的實現(xiàn),以求在各個建設項目中能夠合理地使用人力、物力、財力取得較好的投資效益,最終實現(xiàn)使竣工決算控制在審定的概算額內(nèi),避免“三超”現(xiàn)象的發(fā)生,為了有效控制工程造價,應做好 以下幾方面工作:(一)決策階段工程造價的控制 工程造價的確定與控制貫穿于項目建設全過程,但決策階段各項技術(shù)經(jīng)濟決策,對該項目的工程造價有得大影響,特別是建設標準水平的確定、建設地點的選擇、工藝的評選、設備選用等,直接關(guān)系到工程造價的高低。據(jù)有關(guān)資料統(tǒng)計,在項目建設各大階段中,投資決策階段影響工程造價的程度最高,即達到 80因此,決策階段項目決策的內(nèi)容是決定工程造價的基礎,直接影響著決策階段之后的各個建設階段工程造價的確定與控制是否科學、合理的問題。 1、編制投資估算的必要性。投資估算是基本建設前期工 作中的重要環(huán)節(jié)之一。是決策性的文件,它是研究、分析建設項目的經(jīng)濟效果的重要依據(jù)。在經(jīng)濟工作中應該實事求是的反映設計內(nèi)容,反映建設地區(qū)的經(jīng)濟狀況,從估算開始就要正確完整地反映工程項目的建設投資。 2、投資估算必須是設計的真實反映,在投資估算中,應該實事求是的反映設計內(nèi)容,這就要求設計人員從工程規(guī)模和項目內(nèi)容上真實反映設計意圖。主要工藝要進行多方案比較,方案要優(yōu)化,設計方案不僅技術(shù)上可行,而且經(jīng)濟上更應合理。所以工程經(jīng)濟人員從建設方案的優(yōu)選開始,就應該滲透到設計的全過程中去,按照工程造價管理的原則,合理預測投資估 算中各種動態(tài)因素的變化,盡可能打足投資不留缺口,這是編制投資估算工作的關(guān)鍵,也是下階段的重要依據(jù)。(二)設計階段工程造價的控制 工程設計是建設 項目進行全面規(guī)劃和具體描述實施意圖的過程,是工程建設的靈魂,是處理技術(shù)與經(jīng)濟關(guān)系的關(guān)鍵性環(huán)節(jié),是確定與控制工程造價的重點階段。 1、優(yōu)化設計方案,有效控制工程造價 設計質(zhì)量和嘗試是否達到國家規(guī)定、功能是否滿足使用要求,僅關(guān)系到建設項目一次性投資的滿足使用要求,不僅關(guān)系到建設項目一次性投資的多少,而且在建成交付使用后影響項目的經(jīng)濟效益。國外專家指出,雖然設計費用占工程總投資的比例很小,不到 1%,但它對工程造價的影響程度達到 75%。很顯然,搞好工程設計階段的造價控制是有效控制工程造價的關(guān)鍵,重施工、輕設計的 觀念必須克服,控制工程費用應從設計抓起。因此,建設單位在審查設計單位的設計時,要重視設計方案的優(yōu)化,利用各種指標對廠區(qū)總平面圖設計、工業(yè)建筑的空間平面設計進行分析比較,這兩方面的設計不僅對工程造價產(chǎn)生重大影響,而且對施工及投產(chǎn)后的生產(chǎn)、經(jīng)營都有重大影響。 2、對工程項目實行限額設計 控制工程造價,在設計過程中采用限額設計。所謂限額設計就是按照批準的可行性研究報告的投資估算控制初步設計,按照批準的初步設計總概算控制技術(shù)設計和施工圖設計,同時各專業(yè)在保證達到使用功能的前提下,按分配的投資限額控制設計,嚴格控制不合 理變更,保證總投資額不被突破。初步設計階段應按照批準的可行性研究階段的投資估算進行限額設計,控制概算不超過投資估算,主要是對工程是和設備、材質(zhì)的控制。為此,初步設計階段的限額設計工程量應以可行性研究階段審定的設計工程量和設備、材質(zhì)標準為依據(jù),對可行性研究階段不易確定的某些工程量,可參照設計和通用設計或類似已建工程的實物工程量確定。在初步設計限額中,各專業(yè)設計人員要增強工程造價意識,嚴格按照限額設計所分解的投資額和控制工程量以及保證使用功能的條件下進行設計,力求將工程造價和工程量控制在限額內(nèi)。 (三)實施階段 工程造價的控制 工程項目的實施階段是建筑物實體形成階段,是人力、物力、財力消耗的主要階段。工程量大,涉及面廣,影響因素多,施工周期,政策性變化,材料設備價格,市場供求波動大等等。。要提高建設質(zhì)量,控制工程造價,發(fā)揮投資效益,就要在工程實施階段加強工程建設的管理和監(jiān)督職能,從而加強了對工程項目建設的全方位、全過程的造價控制。由于建設工程的復雜性,影響因素的多變性的特點,工程實施階段往往會出現(xiàn)一些意想不到的費用。 1、有效控制工程變更和現(xiàn)場經(jīng)濟簽證 在工程建設項目中,工程變更和現(xiàn)場簽證是不可避免的,但要進行有 產(chǎn)的控制。為防止在施工圖設計中產(chǎn)生漏洞,除在審核時把關(guān)外,還應在甲乙方的圖紙會審、設計院的技術(shù)咨詢中消除,總之,應消滅在開工之前。設計變更應盡量提前,變更發(fā)生得越早,損失越小,反之就越大。為此,必須加強設計變更管理,盡可能把設計變更控制在設計階段初期,尤其對影響工程造價的重大設計變更,更要用先算帳后變更的辦法解決,使工程造價得到有效控制。 2、嚴格審核工程施工圖預算 根據(jù)施工圖設計的進度計劃和現(xiàn)場施工的實際進度,及時核定施工圖預算。 3、深入現(xiàn)場,收集和掌握施工有關(guān)資料 在工程施工過程,審價人員和費用控制 人員經(jīng)常深入施工現(xiàn)場,對照圖紙察看施工情況,有時與監(jiān)理、總承包方及施工人員進行座談,了解、收集工程的有關(guān)資料,及時掌握現(xiàn)場施工動態(tài);協(xié)助業(yè)主及時審核因設計變更、現(xiàn)場簽證等發(fā)生的費用,相應調(diào)整控制目標,并為最終的工程總結(jié)算提供依據(jù)和做好必要的準備工作。 三、結(jié)尾 建設工程造價的確定與投資控制的實質(zhì)就是運用科學技術(shù)原理和經(jīng)濟及法律手段,解決工程建設活動中的技術(shù)與經(jīng)濟、經(jīng)營與管理等實際問題,只有在項目建設的各個階段,采用科學的計價方法和切合實際的計價依據(jù),合理確定投資估算、初步設計概算和施工圖預算,才能提高投 資效益 . 參考文獻: ;- 1.請仔細閱讀文檔,確保文檔完整性,對于不預覽、不比對內(nèi)容而直接下載帶來的問題本站不予受理。
- 2.下載的文檔,不會出現(xiàn)我們的網(wǎng)址水印。
- 3、該文檔所得收入(下載+內(nèi)容+預覽)歸上傳者、原創(chuàng)作者;如果您是本文檔原作者,請點此認領(lǐng)!既往收益都歸您。
下載文檔到電腦,查找使用更方便
5 積分
下載 |
- 配套講稿:
如PPT文件的首頁顯示word圖標,表示該PPT已包含配套word講稿。雙擊word圖標可打開word文檔。
- 特殊限制:
部分文檔作品中含有的國旗、國徽等圖片,僅作為作品整體效果示例展示,禁止商用。設計者僅對作品中獨創(chuàng)性部分享有著作權(quán)。
- 關(guān) 鍵 詞:
- 外文 翻譯 如何 搞好 建設項目 工程造價 控制
鏈接地址:http://m.kudomayuko.com/p-33378.html